|
|
[1]Pour or trwel out sufficient Sikabond T52 or T54 ensuring that timber is placed within 1 hour or before surface skin has formed. |
[2]Using a square notched trowel spread the adhesive evenly at a minimum consumption of 0.5Kg/m2. (approx. 3mm notched depth) |
|
[3]Place timber without delay to required line & level, adjusting with a mallet and block if required.
|
4]After a minimum of 18 hours (min. 24 hours for T54) the timber can be sanded and finishe |