[1] Pour or trwel out sufficient Sikabond T54 ensuring that timber is placed within 1 hour or before surface skin has formed. |
[2] Using a square notched trowel spread the adhesive evenly at a minimum consumption of 0.5Kg/m2. (approx. 3mm notched depth) |
|
|
[3] Place timber without delay to required line & level, adjusting with a mallet and block if required.
|
{4] After a minimum of 18 hours (min. 24 hours for T54) the timber can be sanded and finished. |